Print Page | Close Window

Best Practice for a small manufacurer

Printed From: Almyta Systems
Category: Almyta Control System (ACS) and ABC Inventory
Forum Name: Inventory Control
Forum Discription: Inventory operations
URL: http://www.almyta.com/forum/forum_posts.asp?TID=16897
Printed Date: 11 Jul 2020 at 8:29pm
Software Version: Web Wiz Forums 10 - http://www.webwizforums.com


Topic: Best Practice for a small manufacurer
Posted By: Terrycoughlan
Subject: Best Practice for a small manufacurer
Date Posted: 20 Apr 2020 at 8:07am
Hi, We manufacture a range of sheet metal products. I have set up all of my Items and also my assemblies and their Bills of Materials. What's the best way for me to proceed now?
1/ Can I issue several assemblies on the same Work Order or must each assembly have its own Work Order?
2/ Which of the many reports will give me a list of the assemblies which have been started only. Not interested in completed ones or scheduled ones.(this for the final assembly production guys to tell them what to make)

3/ Is it possible to have a report just listing all the sub assemblies called out on works orders which are "Started". I don't want to see components of sub assemblies.(This for the sub-assembly production guys)

4/ Is there a report for doing a Stock Take? I would like to see, Item Id, Description, Location and Quantity In Stock of ALL items on the system. Even the ones with 0 units in stock.

All help will be hugely appreciated.
Terry







Replies:
Posted By: n3qik
Date Posted: 10 Jun 2020 at 1:28pm
Can't answer your questions, but I would suggest to make a copy your production company, rename it to something like sandbox-xx-xx-xxxx. xx-xx-xxxx is the date. Then you can play around without fear of messing sometime up. Also, when you do start using the production version, make daily backups.





Print Page | Close Window

Forum Software by Web Wiz Forums® version 10 - http://www.webwizforums.com
Copyright ©2001-2011 Web Wiz Ltd. - http://www.webwiz.co.uk