Almyta Systems Homepage
Forum Home Forum HomeAlmyta Control System (ACS) and ABC InventoryInstallation, Updates, Technical Issues
  New Posts New Posts RSS Feed - Moving data from ACS to AID
  FAQ FAQ  Forum Search   Register Register  Login Login

This site is dedicated to Almyta Systems Inventory Software

Moving data from ACS to AID

 Post Reply Post Reply
Author
Message
TheWarrior97 View Drop Down
Newbie
Newbie


Joined: 20 Dec 2011
Points: 14
Post Options Post Options   Thanks (0) Thanks(0)   Quote TheWarrior97 Quote  Post ReplyReply Direct Link To This Post Topic: Moving data from ACS to AID
    Posted: 16 Jun 2012 at 7:52pm
I'm having the hardest time transfering all my data from ACS to AID.  Is there any quick way to do it like backing up and restoring?
Back to Top
BillD View Drop Down
Senior Member
Senior Member


Joined: 01 Jul 2011
Location: Nevada, US
Points: 474
Post Options Post Options   Thanks (0) Thanks(0)   Quote BillD Quote  Post ReplyReply Direct Link To This Post Posted: 20 Jun 2012 at 12:21pm
No, there is no way but outputting to spreadsheets, saving as CSV, importing to AID
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 10
Copyright ©2001-2011 Web Wiz Ltd.

This page was generated in 0.094 seconds.